Project 08-338
Miami VAMC Heliport Feasibility Study
Miami, FL
Owner
Miami VAMC
Prime design consultant services for a feasibility study to determine if an E/R heliport can be constructed at this facility.
Building engineering services include review of existing construction plans, specifications, and reports; on-site verification of existing conditions; analysis of existing systems; review of regulatory codes; study of alternate systems; construction cost estimates; and preparation of findings report.
Estimated Construction Cost: $712,438.00