Project 07-303
Erie VAMC - Switchgear Building
Erie, PA

Owner
Erie VAMC
Photo 1

Engineering services to prepare and complete contract documents for switchgear building and future matching addition. The project will replace the existing 1200 amp, 12 KV switchgear servicing the Medical Center with independent feeds and redundant sources.

Engineering services include review of existing construction plans, specifications, and reports; on-site verification of existing conditions; structural analysis of existing structural systems; review of regulatory codes; preparation of design criteria and loads; preparation of calculations, construction plans, specifications, construction cost estimates; and, bid and construction phase services that include shop drawing review and construction phase site visits.

Construction Cost: $3,200,000.00