Projects 06-188
Butler VAMC Building 131 Air Handler Unit Installation
Butler, PA

Owner
Butler VAMC
Photo 1

Engineering services for structural analysis of existing roof framing load capacity. The analysis was to verify capacity could support Air Handling Unit. Analyzed roof framing for three medical buildings using 40 PSF roof snow load, 24 PSF dead loads, and proposed RTU operating weights. Designed framing for the proposed RTU.

Engineering services include review of existing construction plans, specifications, and reports; on-site verification of existing conditions; structural analysis of existing structural systems; review of regulatory codes; preparation of design criteria and loads; preparation of calculations, construction plans, specifications, construction cost estimates; and, bid and construction phase services that include shop drawing review and construction phase site visits.

Construction Cost: $320,000.00
Send mail to frontdesk@qproq.com with questions or comments about this web site.
Copyright © 2011 QproQ Engineering, Inc. All Rights Reserved. Home