Project 08-335
United Water Owego Cororate Office Expansion
Tioga, NY
Owner
United Water Owego
Prime design consultant services for design of a second floor addition to existing one-story office building.
Building engineering services include review of existing construction plans, specifications, and reports; on-site verification of existing conditions; review of regulatory codes; preparation of design criteria and loads; preparation of calculations, construction plans, specifications, construction cost estimates.
Estimated Construction Cost: $425,000.00