Owner
Columbia Alliance for Economic Development
Engineering services to prepare and complete contract documents for the three-story, entry addition and handicap access ramp. Professional services included preparation of contract documents that included 24"x 36" construction drawings and bound specifications; shop drawing reviews, and pre-design site visits.
Engineering services include review of existing construction plans, specifications, and reports; on-site verification of existing conditions; structural analysis of existing structural systems; review of regulatory codes; preparation of design criteria and loads; preparation of calculations, construction plans, specifications, construction cost estimates; and, bid and construction phase services that include shop drawing review and construction phase site visits.
Estimated Construction Cost: $3,165,000.00